tk88 bet

Keyword: "EVN"

286 Result

Prime Minister Pham Minh Chinh and delegates launch the construction of the 500 kV Lao Cai – Vinh Yen transmission line project (Photo: VNA)

⛦ PM sets higher requirements for 500 kV Lao Cai – Vinh Yen transmission line project

The 500 kV Lao Cai – Vinh Yen transmission line is a strategic national infrastructure project approved by the Government, with Vietnam Electricity (EVN) as the investor. The double-circuit transmission line will span 229.5 kilometers, with 468 tower foundations across the four northern provinces of Lao Cai, Yen Bai, Phu Tho, and Vinh Phuc. The total investment for the project is over 7.41 trillion VND (290.41 million USD).
The Vietnamese section of the Monsoon – Thanh My 500kV transmission line project (Photo: VNA)

500kV transmission line from Laos energised

The Monsoon – Thanh My 500kV transmission line project is designed to import electricity from Laos’ Monsoon wind power plant to Vietnam, adding 600 MW to the national power grid during the 2024–2025 period.​
Bach Ho oil field of PVN. (Photo: VNA)

🌟 Six SOEs to be transferred back to industry ministry

Six State–owned enterprises (SOEs) with a total State stake of 800 trillion VND (31.5 billion USD) will be transferred back to the Ministry of Industry and Trade (MoIT) after six years under the management of the Commission for the Management of State Capital at Enterprises (CMSC).
Quang Trach – Pho Noi 500kV circuit-3 power transmission line: Miracle in infrastructure development

𝓰 Quang Trach – Pho Noi 500kV circuit-3 power transmission line: Miracle in infrastructure development

Quang Trach – Pho Noi 500kV circuit-3 power transmission line is a key project with a total investment of nearly 880 million USD. Spanning 9 provinces, the 519-km power transmission line plays an important role in enhancing the operational stability for the electricity supply system in the north in 2024 and following years, contributing to ensuring the national energy security.
Deputy Chu Thi Hong Thai of Lang Son province raises a question at the Q&A session. (Photo: VNA)

♑ 4G mobile network coverage reaches 99% of Vietnamese population: Minister

Vietnam's 4G mobile network coverage now reaches 99% of the population, bringing the country close to the level of developed nations, which is at 99.4%, Minister of Information and Communications Nguyen Manh Hung affirmed at a Q&A session as part of the 15th National Assembly’s ongoing 8th sitting on November 12.
Coal is loaded onto a lorry at a mine of the Khanh Hoa coal company, a subsidiary of Vinacomin. (Illustrative photo: VNA)

Vietnam to boost coal trading with Laos

Minister of Industry and Trade Nguyen Hong Dien chaired a working session with energy and mineral enterprises in Hanoi on August 27 to discuss the promotion of coal trading with Laos.
SOEs are proposed to develop offshore wind power projects. (Photo: VNA)

🐠 Ministry proposes SOEs pilot offshore wind power development

The Ministry of Industry and Trade (MoIT) has proposed two state-owned energy corporations or military-run units be selected to develop offshore wind power projects, given their available resources and considerable experience in the management and operation of power plants and transmission system, as well as national security issues.
Circuit-3 500kV transmission lines – continuation of miracle

𒀰 Circuit-3 500kV transmission lines – continuation of miracle

Thirty years ago, at 7:07pm on May 27, 1994, the 500kV power transmission line system was officially put into operation. This was said to be a miracle of the 20th century since it set unprecedented records such as the length of nearly 1,500km, complex technology, and design and construction conducted concurrently in just two years.
{tk88 bet}|{tk88 bet}|{tk88 bet}|{tk88 bet}|{tk88 bet}|{tk88 bet}|{tk88 bet}|{tk88 bet}|{tk88 bet}|{tk88 bet}|