The Management Authority for Urban Railways (MAUR) in Ho Chi Minh City launched a trial run of Metro Line No.1 on Long Binh Depot’s railway W1 in Thu Duc City on August 30.
Trains on the Nhon – Hanoi Railway Station metro line were put on a trial run at a maximum speed of 80 km per hour on December 6. The trains departed from the S1 Station (Nhon) and ran to S8 Station (Cau Giay district) and returned. The distance between the two stations is 8.5 km.
A trial run of a stock trading system from the Republic of Korea, known as KRX, will be conducted from June 14 next week, Ho Chi Minh Stock Exchange (HoSE) announced on June 10.
A trial run of a stock trading system from the Republic of Korea with securities companies will be conducted after the Tet (Lunar New Year) holiday, Tran Van Dung, Chairman of the State Securities Commission of Vietnam (SSC), told a press conference on January 19.
The trial run of Hanoi’s Cat Linh-Ha Dong urban railway project will take place from December 12 to 31 to access its safety, Vu Hong Phuong, director of the Transport Ministry’s railway project management board, told reporters.
HCM City plans to launch a trial run of the first metro line section between Binh Thai intersection and Long Binh Depot in District 9 in the third quarter of this year.
Communication works should be carried out in an effective manner to raise public awareness of the important role of the urban railway to the city’s development, according to Chairman of the Hanoi Railway One Member Limited Company Vu Hong Truong.
The plan for the trial run of the Cat Linh-Ha Dong urban railway project, Hanoi’s first metro line, must be rebuilt as the date for the test run in October has passed, according to Deputy Minister of Transport Nguyen Ngoc Dong.
The Hanoi Railway Transport Joint Stock Company (Haraco) has successfully conducted a trial run of an international container train connecting China’s Guangzhou province and Hanoi’s Yen Vien town.
The world’s self-driving taxi, which was developed by researchers from nuTonomy, a Singapore-based transportation software firm, was allow to trial run in a 6-km route in Singapore on Aug 25.